TADBIR SAZAN SARAMAD

Tadbirsazan Saramad

In 2011 Tadbirsazan Saramad Company which was established by PEDC, Mahtab Gostar and Omid Investment Company, as its main shareholders, participated in a tender bid held for its privatization. The plant has since been running continuously and has received full contract price from the client at capacity and the above figures represent the actual client’s demand delivered to the grid. Currently the company is installing 3 steam power units, with a total capacity of 480 MW, to Convert the nature of the power plant to combined cycle.By completion of these 3 units the plant will have 3 combined cycle power generation blocks with a total capacity of more than 1434 MWh.

tad1
tad2
tad3
  • Portfolio
  • Main activities
  • Power Plant specifications
  • Contact

Since 2011 the company has been able to deliver power to the grid via its 230 KV substation as shown in following table in Mw-H.

2011 2012 2013 2014 2015 2016 2017
348458 2388362 2808047 3348818 3542173 3456581 3779252

The plant has always been continuously operational and received the full contract price from the client for the full capacity and the above figures represent the actual client’s demand delivered to the grid. Currently the company is installing 3 steam power unit, with total capacity of more than 460 MW, to convert the power plant to combined cycle By completion of these 3 units the plant will have 3 combined cycle power generation block with total capacity of more than 1414 MW.

Number of Units

  • Managing Director: Alireza Sadrabadi
  • Tel : (+98) 2126401812-13
  • Fax : (+98) 2126401812-13
  • Email : info@tadbirsazansaramad.com
  • website : www. tadbirsazansaramad.com
  • Address: No. 15, Taban ave., South Naft, Mirdamad St., Tehran, IRAN