QESHM MOVALLED

Qeshm Movalled Company (Private Joint Stock) was established in 2007 with the aim of investing in and constructing (designing, building, and operating) a combined cycle power plant with a capacity of 500 MW in the Companies registration office of Qeshm Free Zone.

In 2014, with the participation of Pasargad Energy Development Company and its affiliated companies in the shareholders of this company, in addition to the construction of a 500-megawatt combined cycle power plant, the utility requirements of the companies in the Pasargad Energy Development Group, including Pars Behin Oil Refining Company in Qeshm and Hara Jetty, were also assigned to this company. To this end, three gas units with a total capacity of 70 MW, three HRSG units, desalination facilities, and drinking water production were acquired and are currently operational.

Projects of Qeshm Movalled Company are located on Qeshm Island, Laft Road, near Zainabi Intersection.

The purpose of establishing the company and its main area of activity is to invest in and construct power generation facilities for the national grid as well as ancillary services (utilities) for the Pars Behin Oil Refinery, Hara Jetty, and the under-construction Javid Energy Petro Refinery, and to build a 500 MW combined cycle power plant in Qeshm Free Zone. Supplying a portion of the drinking water consumption of the residents of Qeshm Island is also among the missions of Qeshm Movalled Company.

Current investments of Qeshm Movalled Company:

230KV Substation

One Frame 6 gas turbine with a nominal capacity of 35 MW.

Three steam production units with a total capacity of 230 tons per hour.

Four desalination units with a total capacity of 680 cubic meters per hour.

Desalinated water production unit with a capacity of 155 cubic meters per hour.

Drinking water production unit with a capacity of 660 cubic meters per hour

One Gas Unit with a nominal capacity of 320 MW

The total area of the power plant is about 50 hectares. The total floor area of the gas-fired power plant building and annex is 1,745 square meters, and the floor area of other buildings including the central control building, clinic, generator, fire brigade, fire pump, office building, sewage treatment plant, and warehouse is over 3,458 square meters.

About 20,000 square meters of the remaining power plant land is allocated to the development plan, which is sufficient in every respect.

Contact

Call us
Tel : (+98) 21 – 79717500
Email us
Qeshmmovalled@pedc.ir
Location
Unit 503, No.38, Hamila Center, Fallahzadeh Blvd., Pounak, Tehran P.O.Box: 1469644135
Field of activity
Investment and construction of Pasargad Qeshm utility production unit and powerplant
contact-us