SHAMS PASARGAD POWER GENERATION

The company formerly known as Andisheh Sazan Behin Saramad, is the owner of Shariati Combined Cycle Power Plant, which was established in September 2011. The Shariati power plant consists of six F5 gas units, each with a capacity of 25 MW, and one combined cycle block consisting of two gas units, each with a capacity of 123.4 MW, and a steam unit with a capacity of 105 MW, as well as a 3 MW DG unit. Currently, a block with a capacity of 150 MW is also under construction. The company's main activities include managing and supervising the power plant's operations, supplying electricity to wholesale markets and large consumers through bilateral contracts, participating in energy exchange transactions, and investing in and purchasing existing power plants.

The specifications of the Shariati power plant are as follows:


Type of power plant: combined cycle

Area: 33 hectares

Turbine type: Hitachi and GE-F9 gas turbine

Capacity under ISO conditions: 854 MW

Nnumber of units: 6 F5 gas turbine units with a capacity of 25 MW each, one combined cycle block consisting of two gas units, each with a capacity of 123.4 MW, and a Siemens steam unit with a capacity of 105 MW

The main fuel used is gas, with diesel fuel as backup

The specifications of the DG units are: 2 units with a capacity of 1 MW each (Perkins, UK) and 2 units with a capacity of 5.0 MW each (Schmitt, Germany).

Contact

Call us
Tel : (+98) 513-3963021
Fax : (+98) 513-33961605
Email us
tabesh.shaiati@gmail.com
website
www. tadbirsazansaramad.com
Location
Next to the Shariat Power Plant, Km 10 of Sarakhs Rd., Mashad
Field of activity
Management and supervision of repair, maintenance and operation of Shariati combined cycle power plant (500 MW)