News

Entries for 'time'
IOOC Launches Plan to Revive coral reefs in Khark Island
 

IOOC Launches Plan to Revive coral reefs in Khark Island

TEHRAN (Shana) – The Iranian Offshore Oil Company (IOOC) has joined the Department of Environment (DOE) to save the coral reefs of Khark Island ...

Timely Implementation of Goreh-Jask Pipeline Project Necessary: CEO
 

Timely Implementation of Goreh-Jask Pipeline Project Necessary: CEO

TEHRAN (Shana) -- The CEO of the Petroleum Engineering and Development Company (PEDEC) stressed the necessity of completing the Goreh-Jask oil pipelin...

PUT Repairs Multi-Purpose Drilling Simulator
 

PUT Repairs Multi-Purpose Drilling Simulator

TEHRAN (Shana) -- The Petroleum University of Technology (PUT) has launched a multi-purpose and high-tech drilling simulator for the first time in Ira...

Processing topside ready for Johan Sverdrup
 

Processing topside ready for Johan Sverdrup

Fully assembled and tested, the topside for the Johan Sverdrup processing platform is leaving the Samsung Heavy Industries yard on time, below budget ...

Aasta Hansteen on stream
 

Aasta Hansteen on stream

On 16 December Equinor and its partners started production from the Aasta Hansteen gas field in the Norwegian Sea. Today, 17 December gas from the Aas...

Wired drill pipe contracts awarded
 

Wired drill pipe contracts awarded

Equinor is stepping up its use of wired drill pipe to acquire subsurface real-time data during drilling operations, in line with the corporate digital...

Newbuilt shuttle tankers for the Roncador field in Brazil
 

Newbuilt shuttle tankers for the Roncador field in Brazil

The crude oil production from the newly acquired 25 % interest in the Roncador oil field in Brazil will be lifted and transported by shuttle tankers. ...

ExxonMobil Singapore Butyl and Resins Plants Begin Production
 

ExxonMobil Singapore Butyl and Resins Plants Begin Production

Hydrogenated hydrocarbon resin and halobutyl production capacity increased 90,000 tonnes and 140,000 tonnes per year respectively Meets growing dema...

Wind farm being considered at Snorre and Gullfaks
 

Wind farm being considered at Snorre and Gullfaks

Equinor and partners at Gullfaks and Snorre have decided to explore the possibilities of supplying the Gullfaks and Snorre fields with power from floa...

Iran to Launch Energy Technology Center
 

Iran to Launch Energy Technology Center

TEHRAN (Shana) -- The Scientific and Technology Department of Iranian Presidential Office will launch an energy technology center for the first time i...

Equinor has installed Batwind - the world’s first battery for offshore wind
 

Equinor has installed Batwind - the world’s first battery for offshore wind

With Batwind in operation, it will for the first time be possible to store energy produced from an offshore wind farm. The battery storage solution...

Disclosing all Volve data
 

Disclosing all Volve data

For the first time all subsurface and production data from a field on the Norwegian continental shelf (NCS) will be disclosed. The operator Equinor...